Planning

Building control and EV charger notification

How UK home EV charger work is notified under the building regulations, in plain language.

By Local EV Installers Editorial Team · Published · Updated

Most home EV charger circuits are notifiable electrical work. In England that is usually handled by an installer registered with a competent-person scheme, who tells building control for you and gives you the proof. If the installer is not registered, you or they must go through building control before the work, which changes the programme and the cost. Wales, Scotland and Northern Ireland have their own routes. A receipt is not a building-regulations certificate. Ask which nation and which route applies to the address.

Home EV wallbox on a UK property

A miss that shows up later: building control and EV charger notification

The mistake is a kitchen fitter's mate connecting the charger and promising 'it's fine, it's only a spur'.

Write building control and EV charger notification into the quote

The contract should say who notifies building control and when you will receive the evidence.

Building control and EV charger notification

A like-for-like repair may differ from a new circuit. A new charger circuit is the normal case and should be treated as notifiable unless your installer shows you why it is not.

  • New circuits are normally notifiable
  • Competent-person schemes are the usual path
  • Nations differ
  • Keep the completion evidence

Check building control and EV charger notification before you accept a price

Ask for the scheme name and registration number before you book.

The price effect of building control and EV charger notification

Doing it properly is included in a professional price. Discovering afterwards that nobody notified can mean opening the job up for an inspector.

Frequently asked questions

Is this the same as DNO notification?

No. Building control and the distribution network are two notifications. You often need both.

What if the house is in Wales?

Use the Welsh route. Do not assume an English Part P sentence covers it word for word.

Does a grant need this paper?

Serious claims and serious buyers both ask for it. Get it anyway.

Can I notify it myself?

Building control will tell you the process and the fee. It is rarely simpler than using a registered installer.

Core buying guides

Start with these high-intent guides, then dig into the rest of the library.

Related guides

Sources and further reading

How this guide was prepared

This guide was written by the Local EV Installers Editorial Team. We compare official guidance, legislation and established consumer information, separate general information from project-specific advice, and show publication dates and sources. We do not accept installer accreditation claims at face value.

Read our full editorial policy.

Get a quote

Get EV charger installation quotes

Start with the installation postcode and service. Add optional detail only if you have it.

Free, no obligationSubmit the form at no cost. You decide whether to accept any quote.

Local introductionsWe pass your enquiry to installers covering the postcode. Reply speed and volume both vary.

No lead sellingDetails go only to relevant installers for quote contact. See the privacy notice.

Ask each company for OZEV status where relevant, competent-person membership and insurance. We introduce local installers. We do not accredit them.

Add more project detail (optional)

You choose whether to accept any quote. Read our installer checks and privacy notice.