How long DNO approval takes for an EV charger

What actually slows distribution-network approval for a home EV charger, and what does not.

By Local EV Installers Editorial Team · Published · Updated

Many straightforward UK home chargers are connected under a notify process rather than a long application. The installer assesses the supply and informs the network operator. That is not the same as waiting months for a bespoke design. Delays appear when the service is looped, the fuse is small, the cable in the street is tight, or someone has asked for three-phase or a large commercial load. Those jobs take as long as that operator's current queue, which is regional and changes. Nobody honest can promise you a national number of days.

EV charger cable run and electrical preparation

A miss that shows up later: how long DNO approval takes for an EV charger

The mistake is starting a G99 form for a plain charger and then blaming the DNO for the confusion.

Write how long DNO approval takes for an EV charger into the quote

Get the path and, if there is a reference number, the number, in writing.

How long DNO approval takes for an EV charger

Ask the installer which path your job is on: notify, or apply and wait. Ask the operator for their current lead time if you are in the second group.

  • Simple jobs are often a notification
  • Loops, fuses and extra phases take longer
  • Lead times are regional
  • Ask which path you are on

Check how long DNO approval takes for an EV charger before you accept a price

Do not book a holiday around a guessed connection date. Do not buy a 22 kW charger while a single-phase notify job would have finished.

The price effect of how long DNO approval takes for an EV charger

The cost of a delay is diary and hire cars, not usually a fee to 'expedite' via the installer.

Frequently asked questions

Can I charge while I wait?

Only if the installer has connected you lawfully. Do not use a granny lead as a protest.

Does chasing help?

A polite request for the queue position helps. Daily emails do not build a cable.

Will a different installer be faster?

They cannot jump a network queue. They can avoid putting you in the wrong queue.

What should I budget for time?

A simple notify install can still be a single visit once surveyed. An upgrade can be weeks or longer. Get the local answer.

Core buying guides

Start with these high-intent guides, then dig into the rest of the library.

Related guides

Sources and further reading

How this guide was prepared

This guide was written by the Local EV Installers Editorial Team. We compare official guidance, legislation and established consumer information, separate general information from project-specific advice, and show publication dates and sources. We do not accept installer accreditation claims at face value.

Read our full editorial policy.

Get a quote

Get EV charger installation quotes

Start with the installation postcode and service. Add optional detail only if you have it.

Free, no obligationSubmit the form at no cost. You decide whether to accept any quote.

Local introductionsWe pass your enquiry to installers covering the postcode. Reply speed and volume both vary.

No lead sellingDetails go only to relevant installers for quote contact. See the privacy notice.

Ask each company for OZEV status where relevant, competent-person membership and insurance. We introduce local installers. We do not accredit them.

Add more project detail (optional)

You choose whether to accept any quote. Read our installer checks and privacy notice.