Commercial

Charging demo EVs in a showroom

How car dealers should charge demo and stock EVs without flattening the workshop supply.

By Local EV Installers Editorial Team · Published · Updated

Demo cars move all day and stock cars sit. You need a few accessible bays for demos that must go out charged, and a slower bank, or even a scheduled rotation, for stock. Workshop ramps, bodyshops and valeting already pull current. A row of unmanaged 22 kW posts will fight the compressor. Many stock cars only need a maintained state of charge, not a full rapid before breakfast. Staff commuting sockets should not steal the demo bay.

Workplace EV chargepoint bays in a UK car park

The expensive shortcut on charging demo EVs in a showroom

The mistake is one domestic wallbox on the showroom wall and a daisy-chain of extension leads to the compound.

Handover when charging demo EVs in a showroom is the issue

Specify demo bays, stock rotation and the workshop load that must win.

Charging demo EVs in a showroom

Ask which models you will hold. A van and a city car do not share a lead length or an AC rate.

  • Demos need certainty, stock needs rotation
  • Workshop loads come first
  • Lead lengths differ by model
  • Do not feed a compound with extension leads

What a survey must prove about charging demo EVs in a showroom

Customer 'try the charger' bays are a sales set. Do not let them become a free public rapid by accident.

Charging demo EVs in a showroom and the written scope

Stock that arrives at 10 per cent on a transporter is the peak. Design a recovery method for that morning, not for an average Tuesday.

Frequently asked questions

Should every space have a post?

Not if cars are stacked three deep. Charge the ones that move, or budget a managed scheme.

Can PDI include the charger install for the customer?

That is a separate home install at their address, with their consent and their supply. Do not confuse it with yard charging.

What power do we ask the landlord for?

A measured diversity figure, not the sum of every socket at full rate.

Is three-phase already in the building?

Often yes. Confirm spare capacity rather than the presence of three phases.

Core buying guides

Start with these high-intent guides, then dig into the rest of the library.

Related guides

Sources and further reading

How this guide was prepared

This guide was written by the Local EV Installers Editorial Team. We compare official guidance, legislation and established consumer information, separate general information from project-specific advice, and show publication dates and sources. We do not accept installer accreditation claims at face value.

Read our full editorial policy.

Get a quote

Get EV charger installation quotes

Start with the installation postcode and service. Add optional detail only if you have it.

Free, no obligationSubmit the form at no cost. You decide whether to accept any quote.

Local introductionsWe pass your enquiry to installers covering the postcode. Reply speed and volume both vary.

No lead sellingDetails go only to relevant installers for quote contact. See the privacy notice.

Ask each company for OZEV status where relevant, competent-person membership and insurance. We introduce local installers. We do not accredit them.

Add more project detail (optional)

You choose whether to accept any quote. Read our installer checks and privacy notice.