Homes

EV charger installation on a park home

Why park-home and static-caravan pitches need the site owner in the EV charger decision.

By Local EV Installers Editorial Team · Published · Updated

Park homes often sit on licensed sites where the pitch electricity is limited and the site owner owns the supply arrangement. A 32 amp charger may be more than the pitch connection can take, and you may not be allowed to alter the supply pillar. Talk to the site before you buy a wallbox. Some pitches can take a modest charger or a controlled load. Some cannot without a site-wide upgrade. The earthing on caravan supplies is its own design topic and not a place for guesswork.

UK driveway EV wallbox installation setting

What goes wrong with eV charger installation on a park home

The mistake is a tether into the pitch socket via adapters every night, or a private trench across a neighbour's pitch.

Point at eV charger installation on a park home in the pack

Get the site's consent and the pitch capacity on the quote before hardware is ordered.

EV charger installation on a park home

Ask the site for the pitch rating in amps and for written permission. Ask an installer who has worked on similar supplies.

  • The site owner controls alterations
  • Pitch amps may be below 32
  • Caravan earthing needs a competent design
  • Adapters are not a permanent plan

EV charger installation on a park home: questions for the first visit

A lower-rate, properly designed point may be the honest outcome. A 7 kW badge that the pillar cannot feed is not.

How eV charger installation on a park home moves the job

Site upgrades are a park cost, sometimes shared. A single resident cannot decide them. Budget time as well as money.

Frequently asked questions

Is a park home a dwelling for grants?

Treat eligibility as a question for the live scheme, with the site rules alongside. Do not assume a house grant fits a pitch agreement.

Can we have 3 kW only?

If the design and the site agree, a lower rate can be the right charger. It must still be a proper circuit.

Who certificates it?

The electrician who does the work, within the permission the site gave.

What if the site refuses?

Then you use public or workplace charging. A refusal is the end of the install.

Core buying guides

Start with these high-intent guides, then dig into the rest of the library.

Related guides

Sources and further reading

How this guide was prepared

This guide was written by the Local EV Installers Editorial Team. We compare official guidance, legislation and established consumer information, separate general information from project-specific advice, and show publication dates and sources. We do not accept installer accreditation claims at face value.

Read our full editorial policy.

Get a quote

Get EV charger installation quotes

Start with the installation postcode and service. Add optional detail only if you have it.

Free, no obligationSubmit the form at no cost. You decide whether to accept any quote.

Local introductionsWe pass your enquiry to installers covering the postcode. Reply speed and volume both vary.

No lead sellingDetails go only to relevant installers for quote contact. See the privacy notice.

Ask each company for OZEV status where relevant, competent-person membership and insurance. We introduce local installers. We do not accredit them.

Add more project detail (optional)

You choose whether to accept any quote. Read our installer checks and privacy notice.